Road and Highway

 

Project Title : Road Improvement Project, Phase -III  Package 2 (funded by Exim Bank of India) which includes:

  • Salleghat-Ramechhap-Sanjgutar Raod(55.00 Km)
  • Gaindakot-Rampur-Ramdi -Pipaldanda Road (130.00 Km)
  • Kakani-Thansing Road(11.00 Km)

Employer : Road Improvement Project, Department of Roads

Major Components of Services : Detailed Survey, Design and Construction Supervision of the Roads

Year of Completion :  On going


Project Title : Road Improvement Project, Phase -III  Package 3 (funded by Exim Bank of India) which includes:

  • Lamahi-Ghorahi Road(23.00 Km)
  • Ghorahi –Tulsipur Road(24.00 Km)
  • Bhalubang-Bagdula-Bhimgitte Road (70.00 Km)
  • Shajpur-Boktan-Dipayal Road (50.00 Kma)

Employer : Road Improvement Project, Department of Roads

Major Components of Services : Detailed Survey, Design and Construction Supervision of the Roads

Year of Completion :  On going


Project Title : Road Improvement Project, Package E (funded by Exim Bank of India)

Employer : Department of Roads/ Foreign Cooperation Branch/Road Improvement Project

Major Components of Services : Detailed engineering survey, design and construction supervision of Upgrading/Rehabilitation/Improvement of following roads

  • Sahidmarg Road(100 Km)
  • Lumbini Buddhist Circuit Road(90 Km)
  • Sanfebagar-Martadi Road(30 Km)
  • Bardghat-Paldanda-Triveni Road (30 Km)

Year of Completion :  On going


Project Title : Road Improvement Project, Package F (funded by Exim Bank of India)

Employer : Department of Roads/ Foreign Cooperation Branch/Road Improvement Project

Major Components of Services : Detailed engineering survey, design and construction supervision of Upgrading/Rehabilitation/Improvement of following roads

Balaju-Ranipauwa-Kakani –Trishuli Road(75 Km)

  • Chhahare-Bidur Road(15 Km)
  • Balku-Dashinkali Road(16 Km)
  • Bhaktapur-Nagarkot Road(41 Km)
  • Bharatpur-Rampur-Meghauli Road(30 Km)
  • Janakpur Parikarma Road(60 Km)

Year of Completion :  On going


Project Title : Traffic, Surface Distress and Road Roughness Survey on Strategic Road Network, SRN for Year 2014 and 2015

Employer : Highway Managment Infromation System(HMIS ICT) Unit/Department of Roads

Major Components of Services : i) Traffic count survey of 160 nodes within the Nepal in both 2014 and 2015 ii) Surface Distress Survey of Strategic Road Network and Determination of Surface Distress Index(SDI) for 5364 Km in 2014 and 4878 Km in 2015 iii) Roughness Survey by using Roughometer and Determination of International Roaughness Index(IRI for 5364 in 2014 and 4878 Km in 2015.

Year of Completion :  2016


Project Title : Software Development for Road Inventory. Phase I Road Inventory Survey of AH-42, Supervision and Monitoring of Phase II Road Inventory Survey of all SRN in Nepal

Employer : Highway Managment Infromation System(HMIS ICT) Unit/Department of Roads

Major Components of Services : i) Developed GIS and Web based Software for Road for Road Inventory Managment including programming database managment and web designing ii) Development Android based Tablet Application, Procedural Guideline, Manual and Formats for Data Collection, Processsing, Upgrading and Reporting for Road Inventory Survey and Processing iii) Carried out Phase -1 Inventory Survey of Asian Highway Ah 42 (392 Km, Sirsiya -Birgunj-Pathalaiya-Hetauda-Narayanghat-Mugling-Naubise-Kathamandu-Bhaktapur-Dhulikhel-Dolalghat-Kodari) by using Tablet Application and uploaded to web server system for preparation of Assets Register and Inventory Management iii) Prepare Terms of References, Cost Estimate and Request for Proposal for selection of Phase II Consulting Assignemtn

Year of Completion :  2016


Project Title : Revision of Standard Specification and Norms for Road and Bridge Works:

Employer : Central Road Laboratory/Department of Roads

Major Components of Services : Consultation with various concerned stakeholders, conduct workshops to gain view of stakeholders, data analysis, revision of Specification and Norms for the Road and Bridge Works 

Year of Completion :  2016


Project Title : Detailed Engineering Survey, Design and preparation of Report of following Roads:

  • Atharai Mansaari Thoklung Fedaam Ekikrit Road, Terahathum(40.83 Km)
  • Kawasoti Bojhapokhari Dedhgaun Vimad Khaireni, Tanaju(32.3 Km)

Employer : Planning Monitoring and Evaluation Unit, Department of Roads

Major Components of Services : Detailed Survey, Design, Cost Estimate and Preparation of Report

Year of Completion :  2015


Project Title :Beltarbazar-Kamphughat-Pamakham Bhanjyang-Temke-Sapsudhap-Mayur Dand-Salpa Pokhari-Gudel to Solu Salleri Road(172 Km)

Employer : Asset Management, Contract Management and Quality Control Project/Department of Roads

Major Components of Services : Detailed Engineering Survey and Design of Highway and other Structures, Preparation of Contract Documents and Preparation of Detailed Project Report(DPR)

Year of Completion :  2014


Project Title : Hatiya-Burtibang Section of Mid Hill Highway(42.9 Km)

Employer : Mid Hill West(Puspalal) Highway Project/Department of Roads

Major Components of Services : Detailed Design for Upgrading of Highway to Blacktop Standard (Review of Mid Hill Highway Project and provision of access points to its corridor, Detailed Engineering Survey and Design of Highway and Other Structures and Preparation of Detailed Project Report (DPR)

Year of Completion :  2014


Project Title : Ganesh Chowk-Chiwa Bhanjyang Sector of Puspalal(Mid Hill) Highway Project

Employer : Mid Hill Highway Project, Eastern Sector /Department of Roads

Major Components of Services : Detailed Design for Upgrading of Highway to Blacktop Standard(Review of existing road corridor and Detailed Engineering urvey, Design, Preparation of Contract Packages Document & Preparation of Detailed Project Report(DPR)

Year of Completion :  2014


Project Title : Lamosangu –Jiri Road(117 Km)

Employer : Planning Monitoring and Evaluation Unit, Department of Roads

Major Components of Services : Detailed Engineering Survey, Detailed Design, Geotechnical Investigation, Preparation of IEE Report, Preparation of DPR

Year of Completion :  2014


Project Title : Prefeasibility study of following Roads

  • Beltar-Kamphu Ghat-Papamakham Bhanjyang-Tyamke Danda-Mayum Danda-Salpapokhari-Gudel- Salleri Road, 226 Km
  • Salpapokhari-East Sankhuwasabha-Num Road,100 Km

Employer : Department of Roads/ Planning, Monitoring and Evaluation Unit

Major Components of Services : Selection of alternative alignments, field study including verification of the alignments, Geological, Hydrological, Environmental, Social studies, preliminary design of roads, tentative cost estimate and technical and economical comparison of the alternative alignment. 

Year of Completion :  2013


Project Title : Detailed Feasibility Study of Following Tunnel Roads

  • Nagdhunga-Naubise Tunnel Road
  • Tokha-Gurje Tunnel Road

Employer : Department of Roads/ Planning, Monitoring and Evaluation Unit

Major Components of Services : Selection of alternative tunnel alignment, detailed engineering survey, traffic survey, geological survey, hydrological/hydrographical study, geotechnical investigation(electrical resistivity test), seismic study, environmental & social study, preliminary design of tunnels, cost estimation, economic analysis and comparison of alternative tunnel alignment

Year of Completion :  2013


Project Title : Detailed survey and engineering design of Chainpur-Taklakot section of North South Corridor, 60 Km

Employer : Department of Roads/ Assets Management, Contract Management and Quality Control Project

Major Components of Services : Detailed engineering survey, geometric design of road, design of side drain, cross drainage structures, pavement ,cost estimation and report preparation

Year of Completion :  2013


Project Title : Detailed Engineering survey and design of Kabeli-Mulghat-Chatara Road( From Ch 78+000 to 91+000), 13 Km

Employer : Department of Roads/ Mid Hill Highway Project, Eastern Sector

Major Components of Services : Detailed engineering survey, geometric design of road, design of side drain, cross drainage structures, pavement, cost estimation and report preparation

Year of Completion :  2013


Project Title : Feasibility Study of Jirmale-Samalbung-Sandakpur Sima Road, 64 Km

Employer : Department of Roads/ Planning, Monitoring and Evaluation Unit

Major Components of Services : Field study, selection of alternative alignment, geological study, hydrological study, preliminary design, social study, environmental assessment, cost estimation, economical analysis, selection of optimum alignment, preparation of Feasibility Study Report

Year of Completion :  2012


Project Title : Detailed Engineering Design of Ekbar-Solu-Okhaldhunga Road (17 Km)

Employer :Harkapur-Okhaldhunga Road Project, Department of Roads

Major Components of Services : Detailed Engineering Survey, Geometric Design of Road, Design of Side Drain, Cross Drainage Structures, Pavement ,cost estimation and Report Preparation

Year of Completion :  2012


Project Title : Review of Existing Road and Its Corridor, Detailed Engineering Survey and Design of Highway and other Structures, Preparation of Contract Documents and Preparation of Detailed Project Report(DPR) of Khurkot-Ghurmi Sector (60 Km) of Mid Hill Highway.

Employer :Puspalal Mid Hill Highway Project, Eastern Sector, Department of Roads

Major Components of Services : Detailed Engineering Survey, Geo-technical Investigation,  Geometric Design of Road, Design of Side Drain, Cross Drainage Structures, Pavement , Land Acquisition Work, Preparation of Cost Estimation, Preparation of Design Report, Preparation of Bid Documents for Different Packages, Preparation of Detailed Project Report.

Year of Completion :  2012


Project Title : Feasibility Study Mawa Khola –Chatraghat Road(55 Km)

Employer : Puspalal Mid Hill Highway Project, Eastern Sector, Department of Roads

Major Components of Services : Field study, Selection of alternative alignment, Geological study, Hydrological study Preliminary design, Social, Environmental assessment, Cost estimation, Economical analysis, selection of optimum alignment, Preparation of Feasibility Study Report

Year of Completion : 2012


Project Title : Detailed Engineering Design of Ghurmi- Chatara Road (Chanage 122+000-139+000)

Employer : Puspalal Mid Hill Highway Project

Major Components of Services : Detailed Engineering Survey, Geometric Design of Road, Design of Side Drain, Cross Drainage Structures, Pavement ,cost estimation and Report Preparation

Year of Completion :  2011


Project Title : Detailed Engineering Design of Ghurmi- Chatara Road (Chanage 105+000-122+000)

Employer : Puspalal Mid Hill Highway Project

Major Components of Services : Detailed Engineering Survey, Geometric Design of Road, Design of Side Drain, Cross Drainage Structures, Pavement ,cost estimation and Report Preparation

Year of Completion : 2011


Project Title : Feasibility Study of Ghurmi-Chatra Road(139.8)

Employer : Puspalal Mid Hill Highway Project

Major Components of Services : Field study, selection of alternative alignment, Geological study, Hydrological study Preliminary design, Social, Environmental assessment, Cost estimation, Economical analysis, Selection of optimum alignment, Preparation of Feasibility Study Report

Year of Completion : 2011


Project Title : Feasibility Study Sankranti-Myaglung Road(46.9 Km)

Employer : Puspalal Mid Hill Highway Project

Major Components of Services : Field study, selection of alternative alignment, Geological study, Hydrological study Preliminary design, Social, Environmental assessment, Cost estimation, Economical analysis, Selection of optimum alignment, Preparation of Feasibility Study Report

Year of Completion : 2011


Project Title : Preparation of Detailed Project Report of Mid Hill Highway( Pokhara East Section), 886 Km

Employer : Puspalal Mid Hill Highway Project

Major Components of Services : Field study, Preliminary design, Geological study, Hydrological study, Social, Environmental assessment, Assessment on the development of Hydropower Projects, Agriculture, Tourism along the proposed highway, Economical analysis, Preparation of DPR Report

Year of Completion : 2010


Project Title : Pre Feasibility Study of Kathmandu-Trisuli-Salyantar-Palungtar-Bhorletar-Pokhara Road(252 Km)

Employer : Puspalal Mid Hill Highway Project

Major Components of Services : Selection of alternative alignments, Field Study including verification of the alignments, Geological, Hydrological, Environmental, Social Study, Preliminary Design of roads, tentative cost estimate and techncial and economical comparison of the alternative alignment. 

Year of Completion : 2010


Project Title : Cheda-Dharmapokhara-Kahali Road Project(21.5Km)

Employer : Mid Western Division Road Office

Major Components of Services : Detailed Engineering Survey and Detailed Design of 21.5Km of hilly road

Year of Completion : 2010


Project Title : Nippani -Baghmara- Dhunge Ghat Road Project (4.2 Km) Under UEIP Project Financed by Asian Development Bank at Ratnanagar Municipality

Employer : Urban and Environment Improvement Project

Major Components of Services : Detailed Survey, Geometric Design of Road, Design of Side Drain, Cross Drainage Structures, Pavement Design and Construction Supervision

Year of Completion : 2009


Project Title : Bus -Bay Development project Under UEIP Project Financed by Asian Development Bank at Ratnanagar Municipality

Employer : Urban and Environment Improvement Project

Major Components of Services : Detailed Survey, Architectural Design of ,Structural Design, Cost estimation And preparation of Bidding dacuments of Bus Bay

Year of Completion : 2009


Project Title: Hile- Bhojpur feeder Road Project 33 km

Employer : Department of Road funded by DFID under RAP

Major Components of Services : Survey,Design and Acquisition and resettlement Plan (ACRP) of Hile- Bhojpur Feeder Road

Year of Completion: 2007


Project Title : Surface Distress and Road Roughness Survey

Employer : Department of Road HMIS Unit

Major Components of Services : Detailed Traffic Study, Surface Distress and Road Roughness Survey on Strategic Road Network (SRN)

Year of Completion: 2007


Project Title : Dumkibas- Pragatinagar- Narayani Bridge Road (51 km) and Pokhara- Fedi Road (15 km): 1st Year Periodic Maintenance Program under RMDP

Employer : Department of Road

Major Components of Services : Detailed Survey, Design of Receiling/Rehabilitation and Construction Supervision

Year of Completion : 2002


Project Title : Priority Works under Contract no -II

Employer : BPKMCH

Major Components of Services : Design and Contruction Supervision of Parking Lots, including pavement and drainage manangement

Year of Completion : 2001


Project Title : Priority Works under Contract no -II

Employer : BPKMC

Major Components of Services : Detailed Survey, Geometric Design of Internal Road, Storm Watere Side Drain Design, Pavement Design and Construction Supervision

Year of Completion : 2001


Project Title : Priority Works under Contract no -1

Employer : BPKMCH

Major Components of Services : Detailed Survey, Geometric Design of Internal Road, Storm Watere Side Drain Design, Pavement Design and Construction Supervision

Year of Completion : 2001


Project Title : Ghairung Batase-Ghyalchowk Road in Gorkha District(23.65Km)

Employer : DDC/Gorkha

Major Components of Services : Detailed Engineering Survey, Geological and Hydrological Study, Geometric Design of Road, Design of Pavement, Design of Drainage, Cost Estimate etc. 

Year of Completion : 2001


Project Title : Nageshwor-Dendagaun Road in Gorkha District(7km)

Employer : DDC/Gorkha

Major Components of Services : Detailed Engineering Survey, Geological and Hydrological Study, Geometric Design of Road, Design of Pavement, Design of Drainage, Cost Estimate etc. 

Year of Completion : 2001


Project Title : Sitapaila-Madadole-Dandapauwa Road (3.25 Km) and Kalanki-Syuchatar-Hasantar-Narsary Banjyang Road

Employer : Solid Waste Management and Resource Mobilization Centre

Major Components of Services : Detailed Engineering Survey, Geological and Hydrological Study, Geometric Design of Road, Design of Pavement, Design of Drainage, Cost Estimate etc. 

Year of Completion : 2000


Project Title : Feasibility Study of following roads of Nuwakot District (74 Km) a. Kakani-Gurjebhanjyang b. Apraha-Ghalebhanjyang c. Hattigauda-Baryangbhurung

Employer : Dept. of Roads

Major Components of Services : Study of alternative alignment, Traffic Survey, Environment Study alternative alingments, Engineering, Geological study of alternatives alignment, technico-economical comparison of alternative alignments, Tentative cost estimate of alignments, Recommendation of suitable alignment

Year of Completion : 2000


Project Title : Feasibility Study of different roads in following districts (171.05 km) a. Dolakha b. Dhanusha c. Sarlahi d. Nuwakot e. Bara

Employer : Dept. of Roads

Major Components of Services : Study of alternative alignment,Trffic Survey, Environment Study alternative alingments, Engineering, Geological study of alternatives alignment, technico-economical comparison of alternative alignments, Tentative cost estimate of alignments, Recommendation of suitable alignment

Year of Completion : 1999


Project Title : Bhurigaun -Telpani -Surkhet Road (52 Km)

Employer : DOR/NEPECON

Major Components of Services : Detailed Engineering Survey, Geological and Hydrological Study, Geometric Design of Road, Design of Pavement, Design of Drainage, Cost Estimate etc. 

Year of Completion : 1998


Project Title : Bhandara-Lothar-Malekhu Road (35km)

Employer : Div.Road Office, Bharatpur

Major Components of Services : Study of alternative alignment, Traffic Survey, Environment Study alternative alingments, Engineering, Geological study of alternatives alignment, technico-economical comparison of alternative alignments, Tentative cost estimate of alignments, Recommendation of suitable alignment

Year of Completion : 1998


Project Title : Hilepani -Haleshi Road (32 km)

Employer : DOR/NEPECON

Major Components of Services : Study of alternative alignment, Traffic Survey, Environment Study alternative alingments, Engineering, Geological of alternatives alignment, technico-economical comparison of alternative alignments, Tentative cost estimate of alignments, Recommendation of suitable alignment

Year of Completion : 1997


Project Title : Janakpur-Jatahi Road

Employer : Div.Road office, Janakpur

Major Components of Services : Detailed Engineering Survey, Geological and Hydrological Study, Geometric Design of Road, Design of Pavement, Design of Drainage, Cost Estimate etc. 

Year of Completion : 1996