Water Resource,Irrigation, River
Project Title: River Training Master Plan of daraundi River
Employer: DWIDP
Major Components of Services: Detailed Topographical Survey,Detailed Engineering design, Geological and Hydrological study, cost estimation of Daraudi River
Consultancy Fee (NRs): 894129.45
Year of Completion: 2007
Project Title: Socio Technical Plan of Arun Khola River Training Project( Nawalparasi)
Employer: DWIDP
Major Components of Services: Social and Technical Study including detailed desing of of River Training Works in Arun Kola of Nawalparasi District
Consultancy Fee (NRs): 99214.00
Year of Completion: 2007
Project Title: East Rapti River Training Project
Employer: DWIDP
Major Components of Services: Preparation of Project Proposal, study of river training works in East Rapti river, Socioeconomic Study etc
Consultancy Fee (NRs): 94000.00
Year of Completion: 2004
Project Title: Socio Technical Plan of Riu Khola River Training Project
Employer: DWIDP
Major Components of Services: Social and Technical Study including detailed desing of 5Km of River Training Works in Riu Kola of Chitawan District
Consultancy Fee (NRs): 97000.00
Year of Completion: 2003
Project Title: Tribeni Dibya Daham in Tribeni
Employer: Shree Akhanda Jyoti Charitable Trust
Major Components of Services: Design of River Training Works in Narayani River for Protection of Tribeni Dibya dham.
Consultancy Fee (NRs): Charity
Year of Completion: 2002
Project Title: Thopal Khola Irrigation System in Dhading District
Employer: DIO, Dhading
Major Components of Services: Detailed Engineering Survey, Detailed Design Head work, Detailed Design of Canal, Cost Estimation
Consultancy Fee (NRs): 147954.00
Year of Completion: 1999
Project Title: Sudama Irrigation System in Sarlahi District
Employer: DIO, Sarlahi
Major Components of Services: Detailed Engineering Survey, Detailed Design Head work, Detailed Design of Canal, Cost Estimation
Consultancy Fee (NRs): 75000.00
Year of Completion: 1999
Project Title: Following Irrigation System
a. Lamaha Irrigation Project in Rautahat District
b. Fulgama Irrigation Project in Dhanusha District
c. Bhuri Irrigation Project in Mahottari District
d. Pattharkot Irrigation Project in Sarlahi District
e. Kisti Irrigation Project in Morang District
f. Dongraha Irrigation Project in Sunsari District
g. Odare Irrigation Project in Dhankuta District
Employer: SECOND IRRIGATION SECTOR PROJECT (SISP)
Major Components of Services: Detailed Engineering Survey of command area and canal, Engineering Study, Socio-economical survey, Geological study Hydrological study, Agricultural Study Technico-economical analysis, Suitabitiy of irrigaiton system, Detailed Design of Head works and canals, Cost Estimation
Consultancy Fee (NRs): 800000.00
Year of Completion: 1999