Detailed Survey, Detailed Design, Preparation of Cost Estimate, Specification, Tender Document and Construction Supervision of Sewerage System(9 Km), Storm Water Drains(2.67 Km) and two number of Reed Bed Treatment Plants
Detailed Survey, Detailed Design, Preparation of Cost Estimate, Specification, Tender Document and Construction Supervision of Sewerage System(9 Km), Storm Water Drains(2.67 Km) and two number of Reed Bed Treatment Plants